Metal Detector Check List for Belt Conveyor

Please print out this form, fill it out and send it to us using the address or fax number at the bottom of
the page.

Plant:_________________________________________________________________

Address:______________________________________________________________

City_______________________________ State:_______

Zip:____________ Phone:_____________________

Contact:______________________________________________________________

Problem Metals
Smallest Size Metal to be detected:_________in. X _________in. X_________in.

Metal Type(s):____________________________________________________________________________

Processed Materials
Materials to be processed:____________________________________________________

Contain Iron: Yes_____ No_____ If yes, what type?________________________________ %iron _______

General Facility Information
Equipment to be Protected:___________________________________________________________________

Power voltage available: 115 VAC_____ 220 VAC_____ Other_____________________________________

Power Phase: Single_____ Three phase_____

Power Frequency: 50Hz_____ 60Hz_____

Is power regulated? Yes_____ No_____

Will Metal Detector output be routed to a Central Computer Control? Yes_____ No_____

Conveyor Support Frame: Steel______ Wood_____ Other__________________

Belt Conveyor
Normal Burden Depth or Log Dia.:____________ Max. Burden Depth/Log Dia.:____________

Belt Width [ BW ] Speed_______FPM
Conveyor belt must be vulcanized, metallic fasteners may not be used.
Steel core belts may not be used.

a. If belt runs in FORMED CONVEYOR PAN:

Width at bottom of pan (I.D.)____________, at top____________

Conveyor inside height (vertical)____________.

b. If belt runs ON IDLERS:

Idler Spacing [ IS ]____________, Diameter_________________

Belt Sag under load [ BS]____________ Inside Frame Width [ FW ]____________

Troughed Idlers____________, Equal Length?____________, Length____________

Idler Angle [ A ]____________, Side Skirts?____________, Height____________

Welded or Bolted____________.
Clearance [ C ] between belt (under load) and top of frame (steel stringers).

cross section drawing

Metal Free Conveyor Section

Existing____ or Planned____

Wood______ Fiberglass______ Other______________________

Length____________ Thickness____________ I.D.____________

Please include cross section drawing/sketch of conveyor when ordering a custom built fiberglass
conveyor section from RENS Metal Detectors, A Division of Lacey-Harmer Co.

Metal Free Conveyor Section required for all metal detectors. Length required dependent on
size and type of metal detector search coil.

Use Space below to describe your operation if different from above and/or to give us any other
pertinent information.

______________________________________________________________________________________________

______________________________________________________________________________________________

______________________________________________________________________________________________

______________________________________________________________________________________________

______________________________________________________________________________________________

______________________________________________________________________________________________

______________________________________________________________________________________________

______________________________________________________________________________________________


RENS Mail or fax this form to us at:
RENS Metal Detectors, A Division of Lacey-Harmer Co.
4270 NW YEON AVENUE Portland, OR 97210
(503) 222-9992
FAX: (503) 222-0073
E-MAIL:
rens@laceyharmer.com

| Products | History | Proposal Forms |
| Standard Under Conveyor System | High Powered Under Conveyor System |
| Whole Log System | Hand-Held Units | Fiberglass Sections |
| RENS' Home Page |



webmaster